Behind every power plant, refinery, factory and port crane is a logistics story most people never see: how do you move a transformer, a wind-turbine blade or an entire modular process unit from a factory in one country to a construction site in another? That's project cargo — the transport of large, heavy, high-value or complex equipment that doesn't fit standard containerised shipping — and it runs on engineering as much as on shipping. Delman plans and moves project cargo and heavy lift through Jebel Ali and beyond.

What's included

  • Out-of-gauge (OOG) & oversized cargo — pieces too tall, wide, long or heavy for a standard container, carried on the right specialist equipment instead.
  • Heavy lift — single units beyond normal crane and payload limits, moved with purpose-built lifting gear and vessels.
  • Engineered moves — route surveys, lifting and method plans, lashing and securing, and on-site supervision for energy and industrial projects.

The vocabulary, decoded

Project cargo has its own language, and the words decide the method:

Project cargo terms

  • Breakbulk — cargo shipped as separate pieces, loaded individually rather than in a container.
  • Out-of-gauge (OOG) — cargo that exceeds standard container dimensions: too tall, wide or long to fit inside.
  • Heavy lift — single units beyond normal crane or payload limits, needing specialist lifting gear.
  • Flat rack / open top — container types with no sides or no roof, for cargo that overhangs or is craned in from above.
  • RoRo — roll-on/roll-off: wheeled or trailer-borne cargo driven on and off the vessel.
  • SPMT — self-propelled modular transporter: computer-steered multi-axle platforms for moving huge loads on land.

Choosing the right equipment

The cargo's dimensions and weight decide the method — not the other way around:

  • Flat rack / open-top containers — for cargo only modestly over standard size, keeping it within container handling systems.
  • Breakbulk on conventional vessels — individual heavy pieces using the ship's gear or shore cranes.
  • RoRo — ideal for vehicles, trailers and anything that rolls aboard on its own wheels or a MAFI trailer.
  • Heavy-lift vessels — purpose-built ships with high-capacity onboard cranes for the largest single lifts, the kind that carry port cranes and refinery modules whole.

Most project moves are multimodal: a heavy-lift or breakbulk vessel for the ocean leg, SPMTs or low-beds for the road leg, and mobile cranes at each transfer. When a piece is simply too large to fly, the air-vs-sea trade-off stops being a choice — it goes by sea and road, engineered end to end. See also sea freight and GCC road freight from Dubai.

Planning: where the move is won

The shipping is the visible part; the planning is where success is decided. The classic project-cargo failure isn't the ocean voyage — it's cargo that ships perfectly and then can't make the last few kilometres to site. A serious move includes:

  1. Route survey — verifying road widths, bridge and axle-load limits, overhead clearances, turning radii and site access, end to end.
  2. Lifting & method plan — engineered lift points, crane selection, ground bearing pressure and rigging.
  3. Lashing & securing — calculations to keep cargo safe through sea motion and road forces.
  4. Permits & escorts — abnormal-load permits, police escorts and timing windows for road movements.

Why bring project cargo to Delman

The UAE sits at the centre of a region defined by energy, infrastructure and construction, and it has the ports to match. Jebel Ali offers heavy-lift berths, large laydown and storage areas, and deep connectivity onward to the Middle East, Africa and South Asia; combined with road links across the GCC, it makes Dubai a natural staging hub for project cargo moving into and out of the region. Project cargo concentrates enormous value in single, often irreplaceable units with long lead times, so careful surveying at load and discharge, marine cargo insurance and contingency planning aren't optional — the discipline that protects the cargo is the discipline that protects the project timeline.

  • Engineered, not improvised — route surveys, lift and method plans, lashing and securing built into the move from the start.
  • Multimodal under one team — ocean, road and crane transfers coordinated end to end, with customs clearance handled in-house.
  • Staged through Jebel Ali — heavy-lift berths and laydown on the doorstep of the region's megaprojects.
  • Dubai specialists since 2010 — across six continents from our Al Garhoud base.